237 Gantt StreetMooresville, NC 28115




Move in ready package included - 6' wooden privacy fence, washer, dryer, refrigerator & blinds! Builder/Lender 2-1 Rate Buy Down! (rates in the 4's). Stunning new construction 3 bed 2.5 bath single family home with office or 4th bedroom located in Downtown Mooresville! Open floor plan featuring 9 foot ceilings on both levels and luxurious finishes such as quartz countertops, white shaker cabinetry with 42" uppers, soft close doors & dovetail drawers, tiled kitchen backsplash, designer tile in both primary and guest baths, and pendant lighting. Turnkey move in ready home perfect for first time buyers and investors. Loaded with upgrades including white oak luxury vinyl plank flooring, Pella windows & doors, GE stainless steel appliance package, Moen plumbing fixtures and black hardware. Primary suite offers two closets, dual vanity and shower. Complete with ample parking and fenced in flat yard. No HOA or rental restrictions, can be used for short term, mid term or long term rental. Pack your bags because this one is move in ready!
| yesterday | Price changed to $310,000 | |
| yesterday | Listing updated with changes from the MLS® | |
| 2 months ago | Status changed to Active | |
| 2 months ago | Listing first seen on site |
Listings courtesy of Canopy MLS as distributed by MLS GRID. Based on information submitted to the MLS GRID as of {last_incremented_at}. All data is obtained from various sources and may not have been verified by broker or MLS GRID. Supplied Open House Information is subject to change without notice. All information should be independently reviewed and verified for accuracy. Properties may or may not be listed by the office/agent presenting the information. Some IDX listings have been excluded from this website. Properties displayed may be listed or sold by various participants in the MLS. ©2025 Canopy MLS.
The Digital Millennium Copyright Act of 1998, 17 U.S.C. § 512 (the “DMCA”) provides recourse for copyright owners who believe that material appearing on the Internet infringes their rights under U.S. copyright law. If you believe in good faith that any content or material made available in connection with our website or services infringes your copyright, you (or your agent) may send us a notice requesting that the content or material be removed, or access to it blocked. Notices must be sent in writing by email to DMCAnotice@MLSGrid.com. “The DMCA requires that your notice of alleged copyright infringement include the following information: (1) description of the copyrighted work that is the subject of claimed infringement; (2) description of the alleged infringing content and information sufficient to permit us to locate the content; (3) contact information for you, including your address, telephone number and email address; (4) a statement by you that you have a good faith belief that the content in the manner complained of is not authorized by the copyright owner, or its agent, or by the operation of any law; (5) a statement by you, signed under penalty of perjury, that the information in the notification is accurate and that you have the authority to enforce the copyrights that are claimed to be infringed; and (6) a physical or electronic signature of the copyright owner or a person authorized to act on the copyright owner’s behalf. Failure to include all of the above information may result in the delay of the processing of your complaint.
Last checked - 2025-12-07 07:02 PM UTC


Did you know? You can invite friends and family to your search. They can join your search, rate and discuss listings with you.